Wednesday, 12 June 2013

Pentland Road windfarm (2)

P6083697
This morning’s news brought a jaw-dropping clanger. The Pentland Road windfarm is not able to operate at the moment, because the local electricity grid is not able to handle its output. Excuse me? When the windfarm was designed and put up for planning permission, wasn’t the local grid infrastructure taken into account? Or more to the point, the fact that it wouldn’t be able to accommodate the output from this windfarm? So why wasn’t the grid upgraded? Or were we waiting for the interconnector by any chance?
The blame game, between developers, power company and local council, is in full swing.

No comments:

Post a Comment