Showing posts with label Renewables. Show all posts
Showing posts with label Renewables. Show all posts

Monday, 29 June 2015

No Eishken windfarm

Although this blog was discontinued in July 2014, I am briefly reopening it to report on an issue that Arnish Lighthouse was very vocal on.

Local journalist Iain Maciver has revealed that power company GDF / Suez has cancelled the construction of the 39-turbine windfarm in the Eishken district of Lewis. The reasons appear to be that the procrastination over the building of the high voltage sub-sea electricity cable (interconnector) was one of the main reasons. The economic case for said cable has always been flimsy, and is now no longer viable. What renewable energy schemes are left in the island, including the 26-turbine windfarm to the northeast in Pairc, are insufficient to make the case for the cable.

Since 2005, this blog has been very vocal in its opposition to any large-scale windfarms in Lewis. The 180-turbine North Lewis windfarm was scuttled in 2008, after it was found to be in breach of an EU habitat directive that is in place for the central moorlands of the island. Any plans for a resurrection on a smaller scale are now at least in doubt.

There is a silver lining for those to whom this news constitutes a cloud. A cancellation clause means that £2 million pounds of community benefit will be transferred to community groups, who were due to receive £1m annually, had the windfarm materialised.

Wednesday, 13 November 2013

Pairc buy-out

On Thursday 21st November, a meeting will be held for residents of South Lochs and members of the Pairc Trust to determine whether the community of South Lochs will endorse a voluntary transfer of the Pairc Estate to the Pairc Trust. This would be in the place of the current Part 3 compulsory purchase, against the landlord’s wishes. The asking price is actually higher than under the compulsory purchase, and the difference is expected to be raised from the public purse.

Whilst an amicable transfer would of course be preferable, I am by no means convinced that in this case it is to the benefit of the community. The delaying tactics from the landlord have dragged this saga out since 2004, admittedly serving to show up all the weaknesses in the legislation. A favourable settlement would involve the same asking price, to name but a thing. However, full details on the T&C’s for this agreed transfer will be provided at the meeting.

Sunday, 15 September 2013

Windfarm subsidy approved

The UK government has announced that renewable energy schemes based on Scottish islands (like the Western Isles) will be given a higher subsidy than its mainland counterparts. This effectively is an incentive to build onshore windfarms in the islands.
This means that the interconnector, the subsea electricity cable taking the power to the mainland, will now be constructed as will the windfarms in Eishken and elsewhere.
This blogger has consistently spoken out against onshore windfarms in these islands. This decision is particularly galling, as the groundswell of public opinion has changed markedly in recent years. An increasing number of onshore windfarms on the mainland have been denied planning permission in the face of mounting public opposition. To my mind, the British government have designated the Scottish islands as the dumping ground for those renewable energy projects (read: windfarms) that nobody else wants, and which are nothing more than paying lipservice to the notion of green energy. Windfarms are inefficient and unreliable sources of energy (the last few days have shown how variable our windspeeds are).
This is a bad decision for our islands, who don’t stand to gain anything like what the development companies will be getting in terms of subsidies and revenue. We’re getting the beads and mirrors whilst our resources are being plundered. I’m not talking about wind energy. Having windturbines around destroys the wilderness aspect that lures so many tourists to these islands. It’s tourism that’s the mainstay of these islands’ economy, stupid. The windfarm in Eishken will yield a few million pounds in community benefit, once Comhairle nan Eilean Siar have worked out how to apply for charitable status for the relevant trust body that is supposed to receive those benefits.
Over the next two years, we’ll see a large fleet of construction vehicles on our roads. Over the next quarter century, the skyline of the Long Island will be marred by a large number of windturbines. Employment prospects for island workers will be low during the construction phase and negligible afterwards. We will not have the benefit of lower electricity prices. We only stand to lose from this announcement.

Wednesday, 28 August 2013

Interconnector: information meetings

SSE are holding two information meetings about the subsea electricity cable they are planning to lay across the Minch, between Gravir and Dundonnell. The meetings will be held at the Resource Centre, Ravenspoint, in Kershader (South Lochs) on Thursday 5th September, and at the North Lochs Community Centre in Leurbost the next day, Friday 6th September.

On both days, the meetings are open to the public from 10am until 7.30pm, with SSE staff on hand to explain what their plans will entail.

Please pass this information to anyone who is interested and in a position to attend.
The interconnector is a high-voltage cable for transmitting electricity to the national grid, which has been generated by renewable energy schemes in Lewis. The main one will be the Eishken windfarm, but other schemes (such as the Pentland Road windfarm, as well as tidal and wave power schemes) will also be able to use this cable. It is essential for the renewable energy sector to take off in this part of the Outer Hebrides.
If the interconnector is built, it will require additional electricity infrastructure in Lewis, such as a spur to the switching station at Arnish [by the Creed Bridge], a sub-station at Gravir and high-voltage power lines across the island.

Thursday, 16 May 2013

Interconnector disconnected

Another posting on the subject of the interconnector. This morning, I grabbed a copy of the Press and Journal and was pleased to read that the interconnector will not now be built until 2017, if at all. It became grimly amusing when I subsequently picked up a copy of the Stornoway Gazette, which was still highlighting a report, which promised 3,500 jobs in the Western Isles out of the renewables industry - provided problems like the interconnector are addressed. The problem will not be addressed in favour of the renewables industry, as the economical case is too weak, in a nutshell.

A decade has been spent by (amongst others) Comhairle nan Eilean Siar trying to get large, shore-based windfarms to these islands. The writing was already on the wall as far back as 2008, when the 180-turbine Barvas Moor windfarm was torpedoed. This was to have been the salvation of the Western Isles economy, with the diaspora flocking home to the 400 jobs at the Arnish Fabrication Yard.

The Eishken windfarm was rubberstamped in a much reduced form, with beads and mirrors being dangled in front of us in the shape of the community benefit - which although fairly substantial, was in no proportion to the profits to be generated by developers and landowners. This too is now dead in the water, as its output requires the interconnector.
I am not going to sit here being accused of wanting to keep these islands back. Far from it. I fully back the Comhairle in its attempts to attract sustainable, long-term and large-scale employment to the Outer Hebrides. Embracing the renewables industry in the way that the Comhairle has done thus far has turned out to be a non-starter. I acknowledge that the geography has proved to be a major stumbling block. But a single focus, rather than taking a diversified approach, did not help either.

Tuesday, 21 August 2012

Interconnector

My attention has been drawn, courtesy commenter Lady Gargar, to a stakeholder consultation (PDF) by SSE on the proposed high-voltage direct current connector between Stornoway and Beauly, for the benefit of renewable energy schemes in the Outer Hebrides. Reliable sources have indicated that construction of the sub-station at Gravir could commence in September, for the cable to become operational from an extended Arnish sub-station to Beauly by 2015.

The documentation, dated June 2012, refers to the schemes in the Western Isles. SSE did announce on 8 August 2012 that the scheme in Pairc will not now go ahead. I am wondering if this invalidates their stakeholder consultation; however, I doubt whether that will thwart the plans for the cable.

Wednesday, 8 August 2012

SSE withdraws from Pairc windfarm

SSE have today announced that they are withdrawing from the proposed 26-turbine 94 MW windfarm at Pairc (South Lochs) in the Isle of Lewis for environmental reasons. This is major news, for several reasons.

It is good to hear that a major player in the renewable energy market, SSE, now recognises that environmental constraints are a good reasons for not siting a windfarm in sensitive areas. Colonies of golden eagles and other raptors were at increased risk of colliding with the turbine blades. It is to be hoped that this approach will be applied to other windfarm schemes across the Scottish Highlands.

Bearing this in mind, the question could be asked whether the Muaitheabhal and Pentland Road windfarms, which have been approved, should not now be reconsidered on their environmental (de)merits. Construction of both schemes is due to begin within the next 12 months.

The implications on a local level are equally major. The Pairc windfarm was one of the schemes that would contribute towards the renewable energy output to be generated in the island, to justify the construction of the interconnector (sub sea cable) to the Scottish mainland. At present, only the Muaitheabhal windfarm in Eishken and the Pentland Road scheme appear to be contributing - and I am not certain that the threshold is now going to be met.

The potential construction of a windfarm on the Pairc Estate has been one of the stumbling blocks for progressing the community buy-out in South Lochs. Had SSE proceeded with the windfarm, this would have caused the value of the land to skyrocket out of the reach of the Pairc Trust, who have striven for nearly a decade to take the estate into community ownership. This being no longer the case, the likelihood of a successful buy-out appears to have taken a substantial boost.

Tuesday, 15 March 2011

Renewables expo

Attended the Martins Memorial Hall this afternoon to view an exhibition by Stornoway Wind, where proposals for a windfarm west of the town of Stornoway were put on display. It is for 47 turbines in the area broadly between the Barvas Hills and the Grimshader road. If all goes according to plan, the windfarm will be operational by 2015.

The expo also expounded on the community benefit, which includes economic and environmental benefits, such as jobs and reduction of carbon footprints.
There were several photo montages, showing how the windfarm would look from various parts of the island, from Ranish in the south of Barvas in the north. And I still don’t like the prospect of a flurry of 300 ft turbines barbed-wiring the skyline. Call me a nimby, but I have not changed my mind since the large AMEC windfarm hit the buffers a few years ago.
On a more positive note, I was pleased to see plans afoot to install a Pelamis (sea-snake) wave energy generator north of Great Bernera. This has virtually no visual impact, although I can imagine that it would be in the way of local fishery. Whether such is the case needs to be investigated.

The only drawback to this project, (and additionally to the windfarm project as well) is that the energy, generated by these renewables assets has to be exported to the National Grid, necessitating the building of a submarine electricity cable, colloquially referred to as the Interconnector. I have expressed my opposition to this project in previous posts - in summary, it would industrialise the village of Gravir (where the cable would come ashore in Lewis), burden the Lochs district with large electricity pylons and have a substantial impact on the West Highlands (from Dundonnell to Beauly).

Thursday, 11 November 2010

Interconnector

Scottish and Southern Energy have announced that a decision on the interconnector, the subsea electricity cable, has been deferred. This means that the construction of various renewables projects in Lewis will be delayed as well. These vary from the Eishken and Pairc Windfarms to the Shader Barrage and community windfarms. Indirectly, it also affects the Pairc buy-out, which is inextricably linked to the proposed Pairc Windfarm.

Comhairle nan Eilean Siar has reacted angrily to the news, saying it will cost the island economy £2.5 million per annum.

I will only go so far as to say that an expression of regret would be sheer hypocrisy on my part. I only regret a delay to the Shader Barrage.

An MEP has commented, saying he intends to raise the profile of the interconnector at European level, in order that funding can be directed that way. He claims it is in the national interest.

Edited to include links and reference to MEP's comment

Tuesday, 2 November 2010

Pairc buy-out

The longest running buy-out saga in the Western Isles, that of the Pairc Estate, continues to be a messy affair. Last Friday, the deadline passed for any submissions regarding this process, but the estate owner, Mr Lomas, continues to contrive obstructions for the buy-out bid to proceed. For instance, he is seeking to get more than £760,000 from the Pairc Trust for legal expenses in opposing their buy-out bid.

Today, EcoHeb, the association of community-owned renewable energy companies in the Western Isles, has urged the Scottish Government not to delay a decision on the Pairc buy-out any further.

I could not agree more.

The reason for Mr Lomas's procrastination is that a planning application for a windfarm on the Pairc Estate is also outstanding from the Scottish Government. An approval of that application would skyrocket the price of the estate, placing it beyond the financial means of the Pairc Estate.

Thursday, 23 September 2010

Windfarms

The overwhelming and recurring theme of my nearly five years as Arnish Lighthouse has been: windfarms. And once again, not to be defeated (or not to be seen to be defeated), a large windfarm development has been launched. Its environmental impact has been published at any rate. A 50-turbine development on land, which has been cleared for such a development, namely in the Bermuda triangle, otherwise known as the tract of pristine Lewis moor, bordered by the Lochs Road in the east, the Pentland Road to the north and west, and the Cleascro Road to the south. A community coordinator is to be appointed by Stornoway Trust, the landowners. All very noble endeavours, I'm sure, for an enterprise that nobody really wants. For such was one of the outcomes of the AMEC windfarm in North Lewis, which foundered on an EU habitat designation a few years ago.

I just cannot get over the blinkered approach adopted by those in local government in Lewis who do not seem to get the message that on-shore windfarms are (to quote an internet contact) "so yesterday" and so not wanted. Worse than that, over the past couple of years, novel sources of renewable energy have risen above the horizon of technical feasibility. How about that tidal barrage at Shader (Barvas)? How about the tidal generator that was lowered into the Pentland Firth off Caithness recently? And since that episode in March this year, when the output of all of Scotland's windfarms was enough to boil 1,000 kettles, I have comprehensively gone off the idea of adopting windfarms as a credible source for our energy requirements.

By all means, Stornoway Trust, adopt a policy of encouraging renewable energy. But please, don't be so narrow in your scope. You won't be the one whose pockets will be lined through this windfarm. You'll be left with the mirrors and beads - whilst the fat cats in the energy industry will grow even fatter.

Monday, 30 August 2010

Pairc buy-out

More developments on the Eastern Front, also known as the Pairc community buy-out bid. I am linking to the article on Hebrides News, but do draw the conclusion that the landlord, Barry Lomas, is actively working to thwart the buy-out bid by every means possible. Apart from that, he is also working to divide the community amongst itself by manipulating those who are ill at ease with the Pairc Community Trust to put out inaccurate information.

According to the latest information, Mr Lomas is seeking a judicial review of the buy-out bid, compensation totalling £760,000 should the bid be thrown out and tried to separate the renewable energy rights from the lands.

This is the first instance that the Land Reform Act has been used in anger, in that a community will force an unwilling landowner to sell his estate. As a long-standing supporter of the community buy-out movement in Scotland I fully endorse the Pairc Trust in its efforts to wrench control of the Pairc Estate from its current owner. I also hope that a decision on the Pairc Windfarm will be delayed by Scottish ministers until this dispute is resolved, as approval of said windfarm would place the estate beyond the financial reach of the Pairc Trust.

Friday, 9 July 2010

Pointless

I have used the title of this post advisedly, and I hope nobody in Point will take this too personally. The Norwegian energy company Statoil has proposed to build two windfarms in the Minch, off Bayble and between Ness and Cape Wrath. The structures, towering 100 metres above the water and an equal length below, would be build in clusters. Each turbine is anchored to the seabed. The people in Point have voiced their opposition, as it would spoil the view. Hmm. Isn't it the community enterprise Point and Sandwick Power that is proposing to build a windfarm off the Pentland Road - and that is NOT going to spoil the view?

Anyway, the Bayble windfarm will be linked to the Gravir interconnector (do I detect another attempt to justify the construction of the interconnector?) to the mainland.

The Stornoway Gazette, in its edition of 8 July, published the results of an unofficial poll, which revealed that 82% of respondents were opposed to the construction of a(nother) large windfarm in Lewis. I think the same applies to offshore. I appreciate that there would be a large element of NIMBY'ism about, but I see no benefit to the island for the Minch windfarms. And the recent problems with no wind just served to underline the folly in overreliance on wind-energy.

Sunday, 4 July 2010

Eishken East

Eishken Estate owner Nick Oppenheim has unveiled plans to build 6 turbines in addition to the recently approved Muaitheabhal windfarm, consisting of 33 turbines. 1% of revenue from this windfarm, entitled Eishken East, will be placed into a community fund by Mr Oppenheim.

Although I do not (yet) know the geographical location of this community windfarm, it would appear to be resulting from the cheese slicer policy adopted by Mr O. Initially, he had wanted to build more than 100 turbines on his estate, but eventually pared it down to 33. Building subsequent, much smaller windfarms (under the banner of community benefit) makes it easier to go through the planning processes. And knowing the preferences of Comhairle nan Eilean Siar, this will certainly be rubberstamped.

It is plain to see that we're going to be landed with the mirrors and beads, whilst the natural resources of this island are being laid waste. Although we're having a gale today, there is no guarantee that the windturbines will always be able to operate. Events in the Isle of Eigg, nearly totally relying on renewable energy, this week showed the reliability of wind energy. There was no wind, and there was no rain for weeks either, leaving the Eiggeach to switch on their much maligned diesel generators.

Friday, 26 March 2010

Powerlines

The company responsible for maintaining the electricity transmission infrastructure in Scotland, SHETL, has unveiled its plans for linking the so-called interconnector to the island grid. This will involve a high-voltage (132 kilovolt) powerline from the Creed River substation to the Arnish Fabrication Yard, thence by subsea cable to a large electricity substation, to be built at Gravir in South Lochs. That is the point where electricity, generated by landbased renewable energy projects in Lewis (e.g. the Eishken Windfarm, the Shader Tidal Barrage and various community windfarms) will be transmitted to the mainland using the interconnector. This subsea cable will link from Little Loch Broom to Beauly (near Inverness), and onwards to Denny in Stirlingshire using the upgraded high-voltage link across the Highlands.

This is all subject to approval by the Scottish Government of the Interconnector and the Arnish to Gravir subsea cable. The project is cited as necessary to pipe all the power, generated by renewable projects, away to the mainland.

A few weeks ago, it was reported that a weather pattern was in place one day which created flat calm conditions across Scotland. All the windfarms in the country, from the Borders to the Northern Isles, only managed to generate enough power that day to boil 1,000 kettles. That would have left an awful lot of folk with cold cups of tea. And we're supposed to rely on that for all our power? Just as well a new tranche of renewable energy project was released this week, related to tidal and wave power in the Pentland Firth, between Orkney and Caithness.

Thursday, 14 January 2010

Eishken Windfarm approved

The Scottish Government has granted approval for 33 windturbines to be constructed for the Muaitheabhal project. Each turbine will stand 450 feet tall, and their combined output (118 megawatts) is reported sufficient to power 55,000 homes. That is several times the number of homes in the Western Isles.

Objections from the John Muir Trust on account of visual impact of the machines have been sidestepped by reducing the number of turbines from 39 to 33. Reactions on BBC Radio Scotland Highlands and Islands this afternoon varied widely. The Scottish Energy Minister stated that this first major windfarm in the Western Isles would grant the islands their place in the renewable energy sector. Others asserted that the decision made a mockery of the recent Local Public Inquiry.

I have made my position on this issue patently clear, as being opposed. This is founded on the visual impact in combination with the effects on wildlife. It also strikes me that the Scottish Government is prejudiced, bearing in mind that one of its advisors on renewable energy is actually a high-ranking official within one of the power companies that will develop this scheme.

Comhairle nan Eilean Siar has hailed this announcement as a major boost for the Western Isles. In my perspective, they have fallen for the beads and mirrors flashed in front of them by the developers of the Muaitheabhal project. Yes, there will be a few million pounds a year for the Comhairle. But the major winners are the developers and the Eishken landowner.

Anyone who thinks that this will eradicate the islands' economic woes at a stroke is seriously at variance with reality. Job benefits will only last for the duration of the construction of the windfarm, and I wonder how many islanders will be getting a job out of it. Maintaining the windfarm only requires a handful of people.The islands' economy could arguably suffer through the windfarm, as it might deter visitors. They come here for an unspoilt wilderness, not to see an industrial estate.

I wonder what the European Union will think of this project, which will have adverse effects on wildlife; on a species of bird that are protected, and any threat to their habitat posed by such a scheme should by default lead to it being turned down. Not so, it would seem.

Once more, big money has spoken. It did so with the Beauly - Denny powerline upgrade, and has done so here. This is not for the benefit of the Western Isles. The Eishken Windfarm is a development to the islands' detriment.

Wednesday, 6 January 2010

Power-line upgrade

The Scottish Parliament was told this afternoon that the Scottish Government has approved the proposed upgrade to the Beauly to Denny powerline. It means that pylon towers of more than 200 feet will be marching across the iconic Highland landscape to carry all the power to the Scottish Central Belt and beyond, which is to be generated by renewable energy schemes across the Highlands and Islands. When this is to become a reality is as yet not known, and it certainly won't happen in the next few years.

This issue is a double-edged sword. I deliberately used the words "renewable energy schemes", to make clear it would not just be for windfarms, but also for wave- and tidal energy projects. I have previously expressed my opposition to the upgrade, and maintain that stance. From my perspective, the economic mainstay of one part of the country is sacrificed for the greater good - and you can take that "good" with a large pinch of salt.

Electricity is something we all need in increasing amounts, but how that energy comes to the consumer "darn sarf" is still debatable. A sub-sea cable round the coast was mentioned on Radio Scotland this morning, for instance.

Wednesday, 4 November 2009

Interconnector

The £300 million sub-sea electricity cable, linking Lewis to the mainland electricity grid, is to be left out of a billion pound green energy investment scheme, Hebrides News reports. It is beyond my scope to assess whether this means the interconnector will not be built, but it does not look too good. The scheme was to augment Britain's move towards the use of renewable energy. In my view, this announcement removes the Western Isles from the list of powerhouses for green energy.

Monday, 2 November 2009

The windfarm and the eagle - II

Second to my previous post on the South Lochs windfarms (Eishken and Pairc), my attention was drawn to another aspect of this case - the Gravir substation and interconnector. The substation, if realised, will industrialise the South Lochs moorlands and the village of Gravir. However, neither will be required in my opinion if the Pairc and Eishken windfarms are denied planning approval on account of the Basses Corbières ruling. The case for the interconnector was always based on the construction of the two windfarms.

The Pentland Road scheme, which I reported on last week, also has a question mark hanging over it on account of a population of golden eagles near the Achmore turn-off, and (in my layman's perspective) is in equal jeopardy. If the BC ruling is held to be applicable in all three cases, then there will be NO renewable energy project in the Western Isles, and no case at all for the interconnector.

I am aware of the community windfarms which are in blueprint for North Tolsta, Horshader and  Ballantrushal. I am aware of the possible Pelamis project off Bernera. But none of these projects are in the planning process (as far as I am aware).

The Shader tidal energy barrage? This will only generate power for 1,500 homes, i.e. a good chunk of the electricity demand of Lewis. Local renewable energy schemes, in my opinion, are the way forward.

Wednesday, 28 October 2009

Windfarms and pylons - II

An update on the two stories I mentioned in my previous two posts.

The approval for the Pentland Road windfarm, 6 turbines near the Achmore junction, has elicited expressions of deep concern from the RSPB. They suggest that the siting of the turbines will adversely affect the golden eagles that live in the area. An environmental impact study, which accompanied the planning application, was described as shoddy, as not conducted in accordance with standards laid down for that type of investigation. The RSPB will now closely scrutinise proceedings and decide on a course of action. As I said last week, a poor exercise in accountability and now, it would appear, an even poorer exercise in planning.

The Beauly to Denny upgrade story from Monday appears to have been a leak, and has blown up into a bit of a storm. One person has alleged that approval for the upgrade was already decided on before the public inquiry was held. I am not at all surprised, bearing in mind the UK government's policies on renewable energy targets. What surprised me was the assertion that all of Scotland's energy needs could be met from renewables, without recourse to nuclear (which I don't much like either) or other technologies, such as clean coal.

What these two items have in common is an arrogant administration, whether it be Comhairle nan Eilean Siar, or the Scottish Government, thinking they are so powerful that they can ride rough-shod over the due planning process, and just making the right noises at the right time, without taking any account whatsoever of public opinion, scientific evidence or legislation.