It is reported
that Comhairle nan Eilean Siar have awarded the lease for the provision
of accommodation at Lews Castle to the company Natural Retreats. It is
worth noting that this accommodation will not just comprise of
self-catering units, but also of serviced accommodation (read: hotel
rooms), a fact that continues to be omitted from local news reports.
A couple of years ago, the Comhairle finally managed to secure
funding for the refurbishment of the Castle, which has lain in disrepair
for years. This work is now nearing completion, meaning that the Castle
can be put to use for the benefit of the whole of the Western Isles.
Natural Retreats will be paying a commercial rent until at least 2044,
and contribute towards the cost of the refurbishment.
Local providers of self-catering accommodation are opposed to this move on the grounds that the Castle development will stand in direct competition to their businesses.
The Council is obliged to obtain best value for money from the use of
its assets, in this case Lews Castle. It is my conviction that they
will have weighed up pros and cons. There will also have been a
tendering exercise, as they are obliged to do under European laws, as a
result of which Natural Retreats has been awarded the lease.
Further details are to be worked out in the next few weeks and months.
The Castle will open to the public next year. Apart from
accommodation, it will host a cafeteria and a museum and archives
section.
Showing posts with label Economy. Show all posts
Showing posts with label Economy. Show all posts
Friday, 25 April 2014
Thursday, 16 May 2013
Interconnector disconnected
Another posting on the subject of the interconnector. This morning, I
grabbed a copy of the Press and Journal and was pleased to read that
the interconnector will not now be built until 2017, if at all. It
became grimly amusing when I subsequently picked up a copy of the
Stornoway Gazette, which was still highlighting a report, which promised
3,500 jobs in the Western Isles out of the renewables industry -
provided problems like the interconnector are addressed. The problem
will not be addressed in favour of the renewables industry, as the
economical case is too weak, in a nutshell.
A decade has been spent by (amongst others) Comhairle nan Eilean Siar trying to get large, shore-based windfarms to these islands. The writing was already on the wall as far back as 2008, when the 180-turbine Barvas Moor windfarm was torpedoed. This was to have been the salvation of the Western Isles economy, with the diaspora flocking home to the 400 jobs at the Arnish Fabrication Yard.
The Eishken windfarm was rubberstamped in a much reduced form, with beads and mirrors being dangled in front of us in the shape of the community benefit - which although fairly substantial, was in no proportion to the profits to be generated by developers and landowners. This too is now dead in the water, as its output requires the interconnector.
I am not going to sit here being accused of wanting to keep these islands back. Far from it. I fully back the Comhairle in its attempts to attract sustainable, long-term and large-scale employment to the Outer Hebrides. Embracing the renewables industry in the way that the Comhairle has done thus far has turned out to be a non-starter. I acknowledge that the geography has proved to be a major stumbling block. But a single focus, rather than taking a diversified approach, did not help either.
A decade has been spent by (amongst others) Comhairle nan Eilean Siar trying to get large, shore-based windfarms to these islands. The writing was already on the wall as far back as 2008, when the 180-turbine Barvas Moor windfarm was torpedoed. This was to have been the salvation of the Western Isles economy, with the diaspora flocking home to the 400 jobs at the Arnish Fabrication Yard.
The Eishken windfarm was rubberstamped in a much reduced form, with beads and mirrors being dangled in front of us in the shape of the community benefit - which although fairly substantial, was in no proportion to the profits to be generated by developers and landowners. This too is now dead in the water, as its output requires the interconnector.
I am not going to sit here being accused of wanting to keep these islands back. Far from it. I fully back the Comhairle in its attempts to attract sustainable, long-term and large-scale employment to the Outer Hebrides. Embracing the renewables industry in the way that the Comhairle has done thus far has turned out to be a non-starter. I acknowledge that the geography has proved to be a major stumbling block. But a single focus, rather than taking a diversified approach, did not help either.
Monday, 28 January 2013
HS2
The British government have announced that HS2 will produce tens of thousands of jobs in the UK economy. On their Number10gov twitter account, the tweet reads: #HS2 is a ‘catalyst that will help secure economic prosperity & support tens of thousands of jobs’ says PM http://ow.ly/hboog
HS2 is also the postal code for rural Lewis, an open goal in this context.
Well, it’s good to finally see some recognition of the contribution made by the men and women of the rural parts of this island. Whilst not negating the similarly worthy contributions from the folk of Stornoway (HS1), it is particularly rewarding, after so many years, decades and centuries of neglect from Westminster, wilful or otherwise.
We can now look forward to the construction of some proper infrastructure, with HS2 being the high speed rail link, running from Butt of Lewis station in the grounds of the lighthouse down the west coast machair, or parallel to the A857, to Barvas Junction, where a low-speed spur runs over the moors to Stornoway. HS2 continues southwest to Carloway, where a subsea tunnel will take the line to Miavaig and Timsgarry Central. After rounding the bay, the line is expected to pass through Mangersta Outer, Islivig and Brenish. Another tunnel will take the trains under the outflows of Lochs Hamnaway and Tealasbhagh to Huisinish, from where HS2 will run down the fifteen miles to Tarbert Central.
HS1 meanwhile will also start at the Butt of Lewis, and speed south along the east coast of the island to North Tolsta. Hugging the line of the main road into town, the line will cross the Cockle Ebb from Tong to Steinish, and enter the town of Stornoway along the line of the Sandwick Canal. Stornoway Central will be located on the seafront, outside the ferry terminal. In order to mitigate the inclines that are met upon leaving Stornoway in a southerly direction, the line will retrace its course as far as Tong, then veer off to the west and south, gradually gaining height through Laxdale. HS1 will then run fairly straight across the moors towards North Lochs and South Lochs, crossing Lochs Leurbost and Erisort by bridge. Finally issuing along the shores of Loch Seaforth, the line will then make for the Harris Hills. The Clisham range will be tunnelled under, meeting the HS2 at Ardhasaig Junction before making for Tarbert Central.
Ach well, we can but dream…
HS2 is also the postal code for rural Lewis, an open goal in this context.
Well, it’s good to finally see some recognition of the contribution made by the men and women of the rural parts of this island. Whilst not negating the similarly worthy contributions from the folk of Stornoway (HS1), it is particularly rewarding, after so many years, decades and centuries of neglect from Westminster, wilful or otherwise.
We can now look forward to the construction of some proper infrastructure, with HS2 being the high speed rail link, running from Butt of Lewis station in the grounds of the lighthouse down the west coast machair, or parallel to the A857, to Barvas Junction, where a low-speed spur runs over the moors to Stornoway. HS2 continues southwest to Carloway, where a subsea tunnel will take the line to Miavaig and Timsgarry Central. After rounding the bay, the line is expected to pass through Mangersta Outer, Islivig and Brenish. Another tunnel will take the trains under the outflows of Lochs Hamnaway and Tealasbhagh to Huisinish, from where HS2 will run down the fifteen miles to Tarbert Central.
HS1 meanwhile will also start at the Butt of Lewis, and speed south along the east coast of the island to North Tolsta. Hugging the line of the main road into town, the line will cross the Cockle Ebb from Tong to Steinish, and enter the town of Stornoway along the line of the Sandwick Canal. Stornoway Central will be located on the seafront, outside the ferry terminal. In order to mitigate the inclines that are met upon leaving Stornoway in a southerly direction, the line will retrace its course as far as Tong, then veer off to the west and south, gradually gaining height through Laxdale. HS1 will then run fairly straight across the moors towards North Lochs and South Lochs, crossing Lochs Leurbost and Erisort by bridge. Finally issuing along the shores of Loch Seaforth, the line will then make for the Harris Hills. The Clisham range will be tunnelled under, meeting the HS2 at Ardhasaig Junction before making for Tarbert Central.
Ach well, we can but dream…
Wednesday, 19 December 2012
Pairc buy-out
The latest twist in the tortuous proceedings of the Pairc buy-out
has occurred. The Court of Session in Edinburgh has ruled that the
community buy-out plans do NOT, as alleged by landowner Barry Lomas,
infringe the landowner’s human rights. The next step in this seemingly
endless wrangle will be a ruling by a sheriff at Stornoway Sheriff Court
whether the ballot by the community in South Lochs on the proposed
buy-out was flawed, or not. This is expected to happen in January.
The buy-out relates to unoccupied common land, away from the villages on the Pairc peninsula. In itself, this is not worth a lot, but a proposed windfarm could propel its value (currently unknown) into the millions of pounds.
A vote to investigate the possibility of mounting a community buy-out of the Pairc estate was taken in November 2004. A ballot in favour of mounting a hostile buy-out bid was taken in December 2009, making it the first instance of a hostile buy-out under the right-to-buy legislation, enacted in 2003.
The buy-out relates to unoccupied common land, away from the villages on the Pairc peninsula. In itself, this is not worth a lot, but a proposed windfarm could propel its value (currently unknown) into the millions of pounds.
A vote to investigate the possibility of mounting a community buy-out of the Pairc estate was taken in November 2004. A ballot in favour of mounting a hostile buy-out bid was taken in December 2009, making it the first instance of a hostile buy-out under the right-to-buy legislation, enacted in 2003.
Wednesday, 19 September 2012
Fuel
Not long after the Office of Fair Trading announced they would
investigate the pricing of fuel in rural areas comes the breathtaking
news that the islanders in the Uists are now practically without fuel supplies.
The reason given in one media outlet is that the tanks at the Loch
Carnan depot need to be repaired, and can therefore not be topped up by
seatanker. Although some supplies are trickling through by roadtanker
from Stornoway, there is now virtual rationing in the islands.
Particularly people whose job it is to look after the elderly and infirm
are now desperately looking around for fuel, which is not there.
Fuel wholesalers Scottish Fuels have faced repeated allegations of profiteering, by appearing to pocket the 5p / litre fuel derogation, introduced by the UK government earlier this year. On top of charging people in the Uist some of the highest prices in the United Kingdom (£1.55 a litre), comes a situation of no fuel at all.
As a gesture of good will, I’d suggest Scottish Fuels gives the Uisteachs a substantial cut in their fuel prices, if only for a day or a week. Will that happen? We live in hope.
Fuel wholesalers Scottish Fuels have faced repeated allegations of profiteering, by appearing to pocket the 5p / litre fuel derogation, introduced by the UK government earlier this year. On top of charging people in the Uist some of the highest prices in the United Kingdom (£1.55 a litre), comes a situation of no fuel at all.
As a gesture of good will, I’d suggest Scottish Fuels gives the Uisteachs a substantial cut in their fuel prices, if only for a day or a week. Will that happen? We live in hope.
Wednesday, 8 August 2012
SSE withdraws from Pairc windfarm
SSE have today announced
that they are withdrawing from the proposed 26-turbine 94 MW windfarm
at Pairc (South Lochs) in the Isle of Lewis for environmental reasons.
This is major news, for several reasons.
It is good to hear that a major player in the renewable energy market, SSE, now recognises that environmental constraints are a good reasons for not siting a windfarm in sensitive areas. Colonies of golden eagles and other raptors were at increased risk of colliding with the turbine blades. It is to be hoped that this approach will be applied to other windfarm schemes across the Scottish Highlands.
Bearing this in mind, the question could be asked whether the Muaitheabhal and Pentland Road windfarms, which have been approved, should not now be reconsidered on their environmental (de)merits. Construction of both schemes is due to begin within the next 12 months.
The implications on a local level are equally major. The Pairc windfarm was one of the schemes that would contribute towards the renewable energy output to be generated in the island, to justify the construction of the interconnector (sub sea cable) to the Scottish mainland. At present, only the Muaitheabhal windfarm in Eishken and the Pentland Road scheme appear to be contributing - and I am not certain that the threshold is now going to be met.
The potential construction of a windfarm on the Pairc Estate has been one of the stumbling blocks for progressing the community buy-out in South Lochs. Had SSE proceeded with the windfarm, this would have caused the value of the land to skyrocket out of the reach of the Pairc Trust, who have striven for nearly a decade to take the estate into community ownership. This being no longer the case, the likelihood of a successful buy-out appears to have taken a substantial boost.
It is good to hear that a major player in the renewable energy market, SSE, now recognises that environmental constraints are a good reasons for not siting a windfarm in sensitive areas. Colonies of golden eagles and other raptors were at increased risk of colliding with the turbine blades. It is to be hoped that this approach will be applied to other windfarm schemes across the Scottish Highlands.
Bearing this in mind, the question could be asked whether the Muaitheabhal and Pentland Road windfarms, which have been approved, should not now be reconsidered on their environmental (de)merits. Construction of both schemes is due to begin within the next 12 months.
The implications on a local level are equally major. The Pairc windfarm was one of the schemes that would contribute towards the renewable energy output to be generated in the island, to justify the construction of the interconnector (sub sea cable) to the Scottish mainland. At present, only the Muaitheabhal windfarm in Eishken and the Pentland Road scheme appear to be contributing - and I am not certain that the threshold is now going to be met.
The potential construction of a windfarm on the Pairc Estate has been one of the stumbling blocks for progressing the community buy-out in South Lochs. Had SSE proceeded with the windfarm, this would have caused the value of the land to skyrocket out of the reach of the Pairc Trust, who have striven for nearly a decade to take the estate into community ownership. This being no longer the case, the likelihood of a successful buy-out appears to have taken a substantial boost.
Tuesday, 3 April 2012
Eishken Windfarm
A new investor has come aboard for the Eishken Windfarm,
meaning that construction can now start in 2013 and electricity
production in 2016. I refer to the linked article for further
information. Without rehashing my well-known position on the issue of
on-shore windfarms, I will only ask one question.
This windfarm is dependent on the interconnector, the subsea electricity cable linking Lewis and Wester Ross, for exporting all that electricity to the mainland. Is there any certainty that the interconnector is going to be built? Because building a huge big windfarm with attendant infrastructure (pylons, cables, substations) - and then suddenly realising there is no way to get the power off to the consumers in the National Grid, sounds to me like monumental folly.
However, I am equally aware that this could also be a method for accellerating the interconnector through the planning process.
Apart from the interconnector, there is also the minor matter of a high-voltage powercable from Wester Ross to Beauly, for that National Grid link-up. Because that link is not built or certain to be built either.
This windfarm is dependent on the interconnector, the subsea electricity cable linking Lewis and Wester Ross, for exporting all that electricity to the mainland. Is there any certainty that the interconnector is going to be built? Because building a huge big windfarm with attendant infrastructure (pylons, cables, substations) - and then suddenly realising there is no way to get the power off to the consumers in the National Grid, sounds to me like monumental folly.
However, I am equally aware that this could also be a method for accellerating the interconnector through the planning process.
Apart from the interconnector, there is also the minor matter of a high-voltage powercable from Wester Ross to Beauly, for that National Grid link-up. Because that link is not built or certain to be built either.
Tuesday, 31 January 2012
Fuel prices
A meeting
was held this evening at Comhairle nan Eilean Siar about the price for
fuel in these islands. Last time I passed a petrol station (which I
usually do on foot), diesel cost an eye-watering £1.55 a litre. American
readers can convert that to more than $9 a (US) gallon.
The meeting was attended by Sam Chambers, boss at fuel wholesalers Scottish Fuels. He claimed that SF only made a few pennies on each litre of diesel at Stornoway. The action group for fair fuel prices say that nobody had come away any the wiser from the meeting, and that they were seeking to extend their action to Orkney and Shetland.
The grievance is that the fuel is transported round Scotland by a tanker that calls at Inverness, Scrabster and Stornoway; with prices at Stornoway some 15 pence higher than at Inverness.
The meeting was attended by Sam Chambers, boss at fuel wholesalers Scottish Fuels. He claimed that SF only made a few pennies on each litre of diesel at Stornoway. The action group for fair fuel prices say that nobody had come away any the wiser from the meeting, and that they were seeking to extend their action to Orkney and Shetland.
The grievance is that the fuel is transported round Scotland by a tanker that calls at Inverness, Scrabster and Stornoway; with prices at Stornoway some 15 pence higher than at Inverness.
Monday, 11 July 2011
Delivery and charges
Two and a half years ago, an e-petition to the Prime Minister was
launched to complain about delivery charges to the Highlands and
Islands. This was ignored by the then PM, Tony Blair, quoting the
introduction of free market competition. I have no confidence that the
current government will be any more sympathetic to our plight, but
nonetheless I would like to invite anyone who reads this and who is
resident in the Highlands and Islands of Scotland to write to both their
MP and their MSP.
Today, I spent a frustrating couple of hours on the Internet, ordering a pack of 100 index cards, measuring 3″ by 5″. As soon as I had entered my postcode, HS1, the company involved would decline the order, saying they did not deliver to that address. Or would treble the delivery charge.
Although the Arnish Lighthouse stands at the end of a rough track, mail is known to get delivered there. Including items up to 20 kg in weight, and with length and girth adding up to not more than 3 metres (just under 10 feet), this according to the Royal Mail website. This will get you delivery at standardised rates right across the United Kingdom, excluding the Channel Islands.
I am angry at the discrimination against residents of our region, just on account of our geographical location. Any item within the constraints of the Royal Mail rates should compulsorily be delivered at those rates or less, irrespective of location
Today, I spent a frustrating couple of hours on the Internet, ordering a pack of 100 index cards, measuring 3″ by 5″. As soon as I had entered my postcode, HS1, the company involved would decline the order, saying they did not deliver to that address. Or would treble the delivery charge.
Although the Arnish Lighthouse stands at the end of a rough track, mail is known to get delivered there. Including items up to 20 kg in weight, and with length and girth adding up to not more than 3 metres (just under 10 feet), this according to the Royal Mail website. This will get you delivery at standardised rates right across the United Kingdom, excluding the Channel Islands.
I am angry at the discrimination against residents of our region, just on account of our geographical location. Any item within the constraints of the Royal Mail rates should compulsorily be delivered at those rates or less, irrespective of location
Thursday, 17 March 2011
Harris Tweed
I am very late in flagging up the fashion show in Harris Tweed that
took place in An Lanntair last Saturday. The occasion was the 100th
anniversary of the Orb trademark. Those who have read my postings over
the past five years will be familiar with my stance on the matter, but I
have given myself time to come up with an approach that is looking more
to the future rather than the past. Else you’d be going forward in
reverse.
It is good to see that there are still people about who are willing to give Harris Tweed a place in world of fashion and beyond. It is certainly laudible that the range of garments is being expanded beyond the old jacket ranges. I sincerely hope that this brings a demand for the Clo Mor, a demand that will be met by supply.
Harris Tweed is not just about the product, it is also about the production. It can only be called Harris Tweed if it was hand-woven in the Outer Hebrides, and verified under the Orb trademark. There is a movement afoot to train new weavers, after many of the old weavers ceased operations. I hope that Harris Tweed can regain the place it so nearly lost after the disastrous mismanagement of the recent past.
It is good to see that there are still people about who are willing to give Harris Tweed a place in world of fashion and beyond. It is certainly laudible that the range of garments is being expanded beyond the old jacket ranges. I sincerely hope that this brings a demand for the Clo Mor, a demand that will be met by supply.
Harris Tweed is not just about the product, it is also about the production. It can only be called Harris Tweed if it was hand-woven in the Outer Hebrides, and verified under the Orb trademark. There is a movement afoot to train new weavers, after many of the old weavers ceased operations. I hope that Harris Tweed can regain the place it so nearly lost after the disastrous mismanagement of the recent past.
Tuesday, 15 March 2011
Renewables expo
Attended the Martins Memorial Hall this afternoon to view an exhibition by Stornoway Wind, where proposals for a windfarm west of the town of Stornoway were put on display. It is for 47 turbines in the area broadly
between the Barvas Hills and the Grimshader road. If all goes according
to plan, the windfarm will be operational by 2015.
The expo also expounded on the community benefit, which includes economic and environmental benefits, such as jobs and reduction of carbon footprints.
There were several photo montages, showing how the windfarm would look from various parts of the island, from Ranish in the south of Barvas in the north. And I still don’t like the prospect of a flurry of 300 ft turbines barbed-wiring the skyline. Call me a nimby, but I have not changed my mind since the large AMEC windfarm hit the buffers a few years ago.
On a more positive note, I was pleased to see plans afoot to install a Pelamis (sea-snake) wave energy generator north of Great Bernera. This has virtually no visual impact, although I can imagine that it would be in the way of local fishery. Whether such is the case needs to be investigated.
The only drawback to this project, (and additionally to the windfarm project as well) is that the energy, generated by these renewables assets has to be exported to the National Grid, necessitating the building of a submarine electricity cable, colloquially referred to as the Interconnector. I have expressed my opposition to this project in previous posts - in summary, it would industrialise the village of Gravir (where the cable would come ashore in Lewis), burden the Lochs district with large electricity pylons and have a substantial impact on the West Highlands (from Dundonnell to Beauly).
The expo also expounded on the community benefit, which includes economic and environmental benefits, such as jobs and reduction of carbon footprints.
There were several photo montages, showing how the windfarm would look from various parts of the island, from Ranish in the south of Barvas in the north. And I still don’t like the prospect of a flurry of 300 ft turbines barbed-wiring the skyline. Call me a nimby, but I have not changed my mind since the large AMEC windfarm hit the buffers a few years ago.
On a more positive note, I was pleased to see plans afoot to install a Pelamis (sea-snake) wave energy generator north of Great Bernera. This has virtually no visual impact, although I can imagine that it would be in the way of local fishery. Whether such is the case needs to be investigated.
The only drawback to this project, (and additionally to the windfarm project as well) is that the energy, generated by these renewables assets has to be exported to the National Grid, necessitating the building of a submarine electricity cable, colloquially referred to as the Interconnector. I have expressed my opposition to this project in previous posts - in summary, it would industrialise the village of Gravir (where the cable would come ashore in Lewis), burden the Lochs district with large electricity pylons and have a substantial impact on the West Highlands (from Dundonnell to Beauly).
Wednesday, 19 January 2011
Fuel prices
I don't own a car, but whenever I pass one of the petrol stations in Stornoway, I do glance at their price board. Fuel prices are now well above £1.40 a litre, and diesel was at £1.50 on January 5th. I'll nip up the road later today to check, but in the meantime, I can report that these ridiculous prices are forcing people to leave the island, or at least relocate closer to their place of work. I heard from at least one person who is in the latter position.
There was a lot of hot air from our esteemed parliamentary representatives, when the idea of a rural fuel derogation was rejected by HM Treasury in London. I think there should be more emphasis on the discrepancies between rural locations. The same tanker that supplies Inverness and Scrabster also calls at Stornoway. So, why is fuel here so much dearer than in Inverness? I think that should be investigated by the council and / or the Scottish Government, and the causes dealt with immediately.
[Entry amended]
There was a lot of hot air from our esteemed parliamentary representatives, when the idea of a rural fuel derogation was rejected by HM Treasury in London. I think there should be more emphasis on the discrepancies between rural locations. The same tanker that supplies Inverness and Scrabster also calls at Stornoway. So, why is fuel here so much dearer than in Inverness? I think that should be investigated by the council and / or the Scottish Government, and the causes dealt with immediately.
[Entry amended]
Thursday, 11 November 2010
Interconnector
Scottish and Southern Energy have announced that a decision on the interconnector, the subsea electricity cable, has been deferred. This means that the construction of various renewables projects in Lewis will be delayed as well. These vary from the Eishken and Pairc Windfarms to the Shader Barrage and community windfarms. Indirectly, it also affects the Pairc buy-out, which is inextricably linked to the proposed Pairc Windfarm.
Comhairle nan Eilean Siar has reacted angrily to the news, saying it will cost the island economy £2.5 million per annum.
I will only go so far as to say that an expression of regret would be sheer hypocrisy on my part. I only regret a delay to the Shader Barrage.
An MEP has commented, saying he intends to raise the profile of the interconnector at European level, in order that funding can be directed that way. He claims it is in the national interest.
Edited to include links and reference to MEP's comment
Comhairle nan Eilean Siar has reacted angrily to the news, saying it will cost the island economy £2.5 million per annum.
I will only go so far as to say that an expression of regret would be sheer hypocrisy on my part. I only regret a delay to the Shader Barrage.
An MEP has commented, saying he intends to raise the profile of the interconnector at European level, in order that funding can be directed that way. He claims it is in the national interest.
Edited to include links and reference to MEP's comment
Thursday, 23 September 2010
Windfarms
The overwhelming and recurring theme of my nearly five years as Arnish Lighthouse has been: windfarms. And once again, not to be defeated (or not to be seen to be defeated), a large windfarm development has been launched. Its environmental impact has been published at any rate. A 50-turbine development on land, which has been cleared for such a development, namely in the Bermuda triangle, otherwise known as the tract of pristine Lewis moor, bordered by the Lochs Road in the east, the Pentland Road to the north and west, and the Cleascro Road to the south. A community coordinator is to be appointed by Stornoway Trust, the landowners. All very noble endeavours, I'm sure, for an enterprise that nobody really wants. For such was one of the outcomes of the AMEC windfarm in North Lewis, which foundered on an EU habitat designation a few years ago.
I just cannot get over the blinkered approach adopted by those in local government in Lewis who do not seem to get the message that on-shore windfarms are (to quote an internet contact) "so yesterday" and so not wanted. Worse than that, over the past couple of years, novel sources of renewable energy have risen above the horizon of technical feasibility. How about that tidal barrage at Shader (Barvas)? How about the tidal generator that was lowered into the Pentland Firth off Caithness recently? And since that episode in March this year, when the output of all of Scotland's windfarms was enough to boil 1,000 kettles, I have comprehensively gone off the idea of adopting windfarms as a credible source for our energy requirements.
By all means, Stornoway Trust, adopt a policy of encouraging renewable energy. But please, don't be so narrow in your scope. You won't be the one whose pockets will be lined through this windfarm. You'll be left with the mirrors and beads - whilst the fat cats in the energy industry will grow even fatter.
I just cannot get over the blinkered approach adopted by those in local government in Lewis who do not seem to get the message that on-shore windfarms are (to quote an internet contact) "so yesterday" and so not wanted. Worse than that, over the past couple of years, novel sources of renewable energy have risen above the horizon of technical feasibility. How about that tidal barrage at Shader (Barvas)? How about the tidal generator that was lowered into the Pentland Firth off Caithness recently? And since that episode in March this year, when the output of all of Scotland's windfarms was enough to boil 1,000 kettles, I have comprehensively gone off the idea of adopting windfarms as a credible source for our energy requirements.
By all means, Stornoway Trust, adopt a policy of encouraging renewable energy. But please, don't be so narrow in your scope. You won't be the one whose pockets will be lined through this windfarm. You'll be left with the mirrors and beads - whilst the fat cats in the energy industry will grow even fatter.
Wednesday, 8 September 2010
Seaweed
[caption id="" align="alignnone" width="500" caption="Seaweed"]
[/caption]
For hundreds of years, the seaweed growing on the shorelines of these islands have provided a source for various materials.
Economically, the kelp became a major contributor towards the economy of the Scottish islands in the 19th century. Napoleon's navy was blockading the United Kingdom 200 years ago, and there was no way that the source material for gunpowder, dried bird droppings, scraped from rocks off the coast of South America (guano), could reach the UK. So, kelp was required and used in huge quantities. Dried and processed in kilns, it reduced to potassium nitrate (potash), which is a base material for gunpowder.
When the Napoleonic wars were over, the shipping lanes opened up and guano quickly supplanted kelp as a source for potash. It was overall a lot cheaper than the labour intensive harvested kelp. The latter was therefore no longer needed, and the price plummeted. It meant severe economic hardship for many islanders, and when the potato famine occurred in the 1840s, it prompted a mass exodus to foreign parts. Kelp continued to be used as a fertiliser on the lazybeds, used by many islanders for growing their crops. In fact to this day, seaweed is being used for that purpose.
A few years ago, a factory opened within the precinct of the Arnish Fabrication Yard, which processes seaweed for various uses, varying from agriculture to the food industry.
Local news website Hebrides Today has announced that seaweed will now also be processed at the Creed Park recycling plant on the Lochs Road (the A859 Stornoway to Tarbert road), 2 miles south of Stornoway. The endproduct will be natural gas (methane), which will power vehicles.
From explosives to fuel - seaweed is making a come-back.
For hundreds of years, the seaweed growing on the shorelines of these islands have provided a source for various materials.
Economically, the kelp became a major contributor towards the economy of the Scottish islands in the 19th century. Napoleon's navy was blockading the United Kingdom 200 years ago, and there was no way that the source material for gunpowder, dried bird droppings, scraped from rocks off the coast of South America (guano), could reach the UK. So, kelp was required and used in huge quantities. Dried and processed in kilns, it reduced to potassium nitrate (potash), which is a base material for gunpowder.
When the Napoleonic wars were over, the shipping lanes opened up and guano quickly supplanted kelp as a source for potash. It was overall a lot cheaper than the labour intensive harvested kelp. The latter was therefore no longer needed, and the price plummeted. It meant severe economic hardship for many islanders, and when the potato famine occurred in the 1840s, it prompted a mass exodus to foreign parts. Kelp continued to be used as a fertiliser on the lazybeds, used by many islanders for growing their crops. In fact to this day, seaweed is being used for that purpose.
A few years ago, a factory opened within the precinct of the Arnish Fabrication Yard, which processes seaweed for various uses, varying from agriculture to the food industry.
Local news website Hebrides Today has announced that seaweed will now also be processed at the Creed Park recycling plant on the Lochs Road (the A859 Stornoway to Tarbert road), 2 miles south of Stornoway. The endproduct will be natural gas (methane), which will power vehicles.
From explosives to fuel - seaweed is making a come-back.
Wednesday, 18 August 2010
August
The Arnish Fabrication Yard has received an order for a tidal energy generator device, which will be trialled in the sea narrows between the islands of Islay and Jura. This is good news, as they are presently completing their last order on the books. Over the past few weeks, two barges with attendant tugs have been moored at the quayside in Glumag Harbour, presumably being loaded with products from the yard. The below photo shows the arrival of the first barge, towed by the Pegasus.
[caption id="" align="alignnone" width="500" caption="Tug Pegasus and barge, 28 July 2010"]
[/caption]
A major news item in the Outer Hebrides generally has been the breakdown of the ferry MV Clansman during July. It suffered a failure in its engine, which required the thing to be taken apart and put back in again. It took them so long - and I'm being cheeky here - because upon reassembly of the engine, they had a screw left over. It was not funny for the people in Barra and Uist, who suffered a 30% downturn in tourism trade. The Uisteachs are now clamouring for the link between Lochboisdale and Mallaig to be implemented. It would nearly halve their seaborne travel times, and even the longer road journey (145 miles from Mallaig to Glasgow, as opposed to 95 from Oban) would still leave them with a shorter journeytime overall.
It was brought to my attention that the occupant of the Keeper's Cottage at the Arnish Lighthouse recently died. Who will take over is as yet not clear. I am indebted to the person concerned for giving me a little of the history of the peninsula, including an image of the old Kildun Cottage, which stood on a hill where now the main building of the Fabrication Yard sits. Should it be possible to restore the cottage to its former location, you'd find it floating up in the air. The cottage was burned in the 1970s, prior to the construction of the yard.
[caption id="" align="alignnone" width="500" caption="Kildun House, pre-1970s"]
[/caption]
I have spent the past two weeks on several forays around Lewis and Harris, in spite of the weather. Summer here has been virtually non-existent, apart from the fact that the temperatures were in the mid 60s (upper teens C) most of the time. I'll post pics of those trips in separate posts. Other activities have included the completion of the transcriptions of the minutes of the Napier Commission, sitting in the Outer Hebrides in the spring of 1883. I am presently compiling an index of the whole report, a mammoth task by any standard. The first instalment can be viewed on this link.
My activities on war history have continued as well, with the compilation of a website, which lists the names of men from Lewis, known to have served with the Canadian Expeditionary Force in the First World War. Trawling through the attestation papers throws up some intriguing gems. Why was one man (from Lewis) deemed to be 'undesirable'? What happened to the little man from Lewis (4 ft 11) who tried to join up twice, in two different towns 20 miles apart? What was the story behind the trapper from the Northwest Territories who died in hospital in Edmonton, after being apprehended for not answering the compulsory call-up for war service in 1917?
I would like to close this post by congratulating our Man at the Helm (Les) on his successful transfer from deepest Staffordshire to the wilds of Newmarket, Stornoway. By all accounts, he is enjoying himself. Hope all goes well with the new place in Suardail, Les.
[caption id="" align="alignnone" width="500" caption="Tug Pegasus and barge, 28 July 2010"]
A major news item in the Outer Hebrides generally has been the breakdown of the ferry MV Clansman during July. It suffered a failure in its engine, which required the thing to be taken apart and put back in again. It took them so long - and I'm being cheeky here - because upon reassembly of the engine, they had a screw left over. It was not funny for the people in Barra and Uist, who suffered a 30% downturn in tourism trade. The Uisteachs are now clamouring for the link between Lochboisdale and Mallaig to be implemented. It would nearly halve their seaborne travel times, and even the longer road journey (145 miles from Mallaig to Glasgow, as opposed to 95 from Oban) would still leave them with a shorter journeytime overall.
It was brought to my attention that the occupant of the Keeper's Cottage at the Arnish Lighthouse recently died. Who will take over is as yet not clear. I am indebted to the person concerned for giving me a little of the history of the peninsula, including an image of the old Kildun Cottage, which stood on a hill where now the main building of the Fabrication Yard sits. Should it be possible to restore the cottage to its former location, you'd find it floating up in the air. The cottage was burned in the 1970s, prior to the construction of the yard.
[caption id="" align="alignnone" width="500" caption="Kildun House, pre-1970s"]
I have spent the past two weeks on several forays around Lewis and Harris, in spite of the weather. Summer here has been virtually non-existent, apart from the fact that the temperatures were in the mid 60s (upper teens C) most of the time. I'll post pics of those trips in separate posts. Other activities have included the completion of the transcriptions of the minutes of the Napier Commission, sitting in the Outer Hebrides in the spring of 1883. I am presently compiling an index of the whole report, a mammoth task by any standard. The first instalment can be viewed on this link.
My activities on war history have continued as well, with the compilation of a website, which lists the names of men from Lewis, known to have served with the Canadian Expeditionary Force in the First World War. Trawling through the attestation papers throws up some intriguing gems. Why was one man (from Lewis) deemed to be 'undesirable'? What happened to the little man from Lewis (4 ft 11) who tried to join up twice, in two different towns 20 miles apart? What was the story behind the trapper from the Northwest Territories who died in hospital in Edmonton, after being apprehended for not answering the compulsory call-up for war service in 1917?
I would like to close this post by congratulating our Man at the Helm (Les) on his successful transfer from deepest Staffordshire to the wilds of Newmarket, Stornoway. By all accounts, he is enjoying himself. Hope all goes well with the new place in Suardail, Les.
Sunday, 4 July 2010
Eishken East
Eishken Estate owner Nick Oppenheim has unveiled plans to build 6 turbines in addition to the recently approved Muaitheabhal windfarm, consisting of 33 turbines. 1% of revenue from this windfarm, entitled Eishken East, will be placed into a community fund by Mr Oppenheim.
Although I do not (yet) know the geographical location of this community windfarm, it would appear to be resulting from the cheese slicer policy adopted by Mr O. Initially, he had wanted to build more than 100 turbines on his estate, but eventually pared it down to 33. Building subsequent, much smaller windfarms (under the banner of community benefit) makes it easier to go through the planning processes. And knowing the preferences of Comhairle nan Eilean Siar, this will certainly be rubberstamped.
It is plain to see that we're going to be landed with the mirrors and beads, whilst the natural resources of this island are being laid waste. Although we're having a gale today, there is no guarantee that the windturbines will always be able to operate. Events in the Isle of Eigg, nearly totally relying on renewable energy, this week showed the reliability of wind energy. There was no wind, and there was no rain for weeks either, leaving the Eiggeach to switch on their much maligned diesel generators.
Although I do not (yet) know the geographical location of this community windfarm, it would appear to be resulting from the cheese slicer policy adopted by Mr O. Initially, he had wanted to build more than 100 turbines on his estate, but eventually pared it down to 33. Building subsequent, much smaller windfarms (under the banner of community benefit) makes it easier to go through the planning processes. And knowing the preferences of Comhairle nan Eilean Siar, this will certainly be rubberstamped.
It is plain to see that we're going to be landed with the mirrors and beads, whilst the natural resources of this island are being laid waste. Although we're having a gale today, there is no guarantee that the windturbines will always be able to operate. Events in the Isle of Eigg, nearly totally relying on renewable energy, this week showed the reliability of wind energy. There was no wind, and there was no rain for weeks either, leaving the Eiggeach to switch on their much maligned diesel generators.
Thursday, 13 May 2010
Sunday drinking
The Stornoway Golf Club is applying for a license to serve alcohol on and off the premises on Sundays. Hebrides News reports that four objections have been lodged, mainly on religious and social grounds. I actually agree with these arguments, which center on the assertion that providing carry-outs contribute towards anti-social behaviour. The low point of the week in my radio listening is Isles FM on Monday morning, listing all the misdeeds of the weekends, perpetrated mainly under the influence of alcohol between Friday and Sunday.
I wish to make it clear that I am not opposed to the consumption of alcohol as such - I am not averse to a glass of beer, wine or spirits at times myself. However, I feel a degree of double-standards in the issue of the Golf Club license creeping in, hence this post.
Either there is Sunday opening in all licensed premises in Stornoway - or all licensed premises are shut on Sunday. If the Golf Club is denied its license, then all licenses for the serving of alcoholic drink on Sunday should be revoked from all the licensed premises in the town.
I wish to make it clear that I am not opposed to the consumption of alcohol as such - I am not averse to a glass of beer, wine or spirits at times myself. However, I feel a degree of double-standards in the issue of the Golf Club license creeping in, hence this post.
Either there is Sunday opening in all licensed premises in Stornoway - or all licensed premises are shut on Sunday. If the Golf Club is denied its license, then all licenses for the serving of alcoholic drink on Sunday should be revoked from all the licensed premises in the town.
Tuesday, 13 April 2010
Qualified qualification
It was with very mixed feelings that I read on Hebrides News that as of 2011 all Harris Tweed weavers will require a formal qualification before they are issued with tweeds by the Harris Tweed mills. Whilst it is a good thing that people's skills are recognised, I am just wondering whether this is not one more nail in the coffin of the Harris Tweed industry.
In the past, weavers learned their skills informally and did not have to gain a formal qualification for the Harris Tweed mills to send them materials to turn into tweeds. They would have been only too happy for any weavers to do work for them, as their order books were bulging and could hardly keep up with demand. And I do not recall that there were major problems with the quality of the work.
I am fully aware that in this day and age, you can only do most jobs if you hold the requisite paperwork (diploma, certificate, whatever) issued by a recognised college. I do not fault anyone for going down this path in the case of Harris Tweed weavers - but only for the reasons given in this paragraph alone.
The Harris Tweed industry has been decimated, with dozens of weavers giving up their looms for lack of work. The closure of the Stornoway mill due to the (lack of) activities on the part of its owner, Brian Haggas of Keighley, exacerbated the situation further. To place a further impediment in the way for people to rejoin the industry is not very wise at all. It shows in a painful manner how skills are being lost that used to be passed down the generations, and commend those in charge of the course for endeavouring to keep them alive.
In my opinion, it would have been much better to have built up a substantial workforce first, and maintain it in later stages using the system of qualifications.
However, there is a final point which is NOT being addressed - the lack of industrial capacity. The mills at Shawbost and Carloway have nowhere near the capacity that used to exist in this island and I am very cynical indeed when I read of all the promotional activity that is going on for Harris Tweed. What is the point of doing all that, including training people to be weavers, if you don't have the capacity to process the tweeds in the volumes that you need to make it a viable industry that will make a substantial contribution towards the economy of these islands.
In the past, weavers learned their skills informally and did not have to gain a formal qualification for the Harris Tweed mills to send them materials to turn into tweeds. They would have been only too happy for any weavers to do work for them, as their order books were bulging and could hardly keep up with demand. And I do not recall that there were major problems with the quality of the work.
I am fully aware that in this day and age, you can only do most jobs if you hold the requisite paperwork (diploma, certificate, whatever) issued by a recognised college. I do not fault anyone for going down this path in the case of Harris Tweed weavers - but only for the reasons given in this paragraph alone.
The Harris Tweed industry has been decimated, with dozens of weavers giving up their looms for lack of work. The closure of the Stornoway mill due to the (lack of) activities on the part of its owner, Brian Haggas of Keighley, exacerbated the situation further. To place a further impediment in the way for people to rejoin the industry is not very wise at all. It shows in a painful manner how skills are being lost that used to be passed down the generations, and commend those in charge of the course for endeavouring to keep them alive.
In my opinion, it would have been much better to have built up a substantial workforce first, and maintain it in later stages using the system of qualifications.
However, there is a final point which is NOT being addressed - the lack of industrial capacity. The mills at Shawbost and Carloway have nowhere near the capacity that used to exist in this island and I am very cynical indeed when I read of all the promotional activity that is going on for Harris Tweed. What is the point of doing all that, including training people to be weavers, if you don't have the capacity to process the tweeds in the volumes that you need to make it a viable industry that will make a substantial contribution towards the economy of these islands.
Wednesday, 10 February 2010
Thwarted
That is, in a word, how Comhairle nan Eilean Siar must be feeling right now. Plans to upgrade Stornoway Town Hall running into mounting opposition, including from within its own authority (see two posts back). And a few days ago, its plans to fill in part of the Inner Harbour at Stornoway were rejected by Stornoway Port Authority on grounds that did not seem unreasonable to me. The rejection was not taken lying down; on the contrary, the reaction from councillors was one of unmitigated fury.
I am reasonably familiar with the problems posed by water getting too close for comfort. As such, it would appear to me that filling in the upper reaches of the Inner Harbour would have been asking for trouble. Anyone who knows our town in winter, will be familiar with the problems posed by flooding at times of high tide and / or high winds. North Beach, Cromwell Street and Bayhead properties can be seen lined with sandbags at such time, and still people end up with wet feet. If you take space away from the water to go to, it will go somewhere else. Like onto the streets of Stornoway.
Perhaps the Town Fathers should go to the oil barons to ask for a contribution towards cleaning up the mess left behind at the Maclennan's Oilyard on North Beach. This is due to be converted to a carpark (and that's what this whole saga is about, carparking space).
I am reasonably familiar with the problems posed by water getting too close for comfort. As such, it would appear to me that filling in the upper reaches of the Inner Harbour would have been asking for trouble. Anyone who knows our town in winter, will be familiar with the problems posed by flooding at times of high tide and / or high winds. North Beach, Cromwell Street and Bayhead properties can be seen lined with sandbags at such time, and still people end up with wet feet. If you take space away from the water to go to, it will go somewhere else. Like onto the streets of Stornoway.
Perhaps the Town Fathers should go to the oil barons to ask for a contribution towards cleaning up the mess left behind at the Maclennan's Oilyard on North Beach. This is due to be converted to a carpark (and that's what this whole saga is about, carparking space).
Subscribe to:
Posts (Atom)