Showing posts with label Consultation. Show all posts
Showing posts with label Consultation. Show all posts

Tuesday, 21 August 2012

Interconnector

My attention has been drawn, courtesy commenter Lady Gargar, to a stakeholder consultation (PDF) by SSE on the proposed high-voltage direct current connector between Stornoway and Beauly, for the benefit of renewable energy schemes in the Outer Hebrides. Reliable sources have indicated that construction of the sub-station at Gravir could commence in September, for the cable to become operational from an extended Arnish sub-station to Beauly by 2015.

The documentation, dated June 2012, refers to the schemes in the Western Isles. SSE did announce on 8 August 2012 that the scheme in Pairc will not now go ahead. I am wondering if this invalidates their stakeholder consultation; however, I doubt whether that will thwart the plans for the cable.

Tuesday, 22 November 2011

Future of the Coastguard

I copy an email I received today regarding the future of HM Coastguard in the United Kingdom.

I am writing to let you know that following the independent review of the reponses of the second period of consultation on our proposals to modernise Her Majesty’s Coastguard the Secretary of State for Transport has today announced the Government’s decision. This can be found at http://www.dft.gov.uk/mca/mcga07-home/emergencyresponse/mcga-searchandrescue.htm
This means that we have now begun the process of moving to a national networked Coastguard operation with a Maritime Operations Centre (MOC) at its heart. We’re also able to announce today that the MOC will be located near Fareham in Hampshire at a purpose built emergency services control centre that was originally designated as a fire control centre.
In addition to this centre there will also be Coastguard centres. at Dover, Aberdeen, Shetland, Stornoway, Belfast, Holyhead, Milford Haven, Falmouth and Humber all operating 24/7. The London coordination centre will continue to be co-located with the Port of London Authority.
We are also improving the leadership of the volunteer Coastguard Rescue Service by strengthening the numbers of existing regular Coastguard officers based in these coastal communities and I’m also pleased to be able to announce that the Coastguard Rescue Service will be strengthened by an increase of 50% to the number of full time officers available to the volunteers for operational attendance, leadership and advice.
This will allow much more flexibility in the management and training of our volunteers and help to remove the current uneven distribution of Coastguard Rescue Teams between their management.
It will also give a greater presence of Coastguard officers in coastal communities and provide increased opportunity for interaction with other emergency services and coastal leisure and commercial bodies.
These officers will operate in teams with a focal point or operational hub. It is intended that these will be based in;
Existing Centres
Additional locations
Lerwick
Aberdeen,
Bridlington,
Walton-on-the-Naze,
Dover,
Falmouth,
Swansea,
Liverpool,
Belfast
Stornoway.
Moray Firth
Northeast England,
Southampton/Portsmouth,
Dorset,
North Devon,
Cardigan Bay,
Strathclyde
Oban/Fort William
This structural change is about the way the regular Coastguard service coordinates search and rescue operations. It is not about the UK’s rescue capability. Although we are reducing staff numbers our new structure will give the UK a nationally networked Coastguard service that is resilient, effective and efficient.
I know that you like me will be acutely aware that whilst this announcement is the beginning of a new era for HM Coastguard it will a time of massive change for colleagues currently based in Yarmouth, Thames, Solent, Portland, Brixham, Swansea, Liverpool, Forth and Clyde whose stations will be closing before 31 March 2015.
This structural change is about the way the regular Coastguard service coordinates search and rescue operations. It is not about the UK’s rescue capability. Although we are reducing staff numbers, our new structure will give the UK a nationally networked Coastguard service that is resilient, effective and efficient. We will continue to provide a quality safety service to the mariner and coastal user and I’d like to thank you for your continued support as we move forward.

Friday, 15 July 2011

Coastguard

I am pleased that the decision was taken not to close Stornoway Coastguard Station as a 24/7 operation, similarly Shetland. It is deplorable that the Forth and Clyde stations are going to be axed. Only goes to show what a bit of pester power can achieve.
Stornoway Coastguard Station, December 2007
Stornoway Coastguard Station, December 2007

Thursday, 19 May 2011

Pester power

Over the past 5 months, a vociferous and concerted campaign has been waged by people up and down the UK, not least in Stornoway, against government plans to reduce the number of coastguard stations and staff. Two demonstrations were held in Stornoway, on 31 January and 19 March. Today, the Transport Committee from the House of Commons came to Lewis to hear views of interested parties on the plans for the MCA. On the same day, the UK Transport Secretary announced that the plans were to be downgraded.

I believe that MCA staff would be supportive of changes in their organisation, if they were shown not to degrade the service offered - or better, improve it. However, making cuts purely for financial reasons is sheer lunacy, and there is an awful lot of people who agree with that. It is pleasing to see that after a lot of noise, those who make the decisions do listen and are thinking again.

Well done, MCA staff.
Well done, all who supported them in their struggle.

So far.

Wednesday, 30 March 2011

Coastguard update

Some good news regarding the campaign against cuts in the coastguard service. I quote from Prime Minister’s Questions this afternoon:
Sarah Newton (Truro and Falmouth): From his visits to Cornwall, the Prime Minister will appreciate the high regard for the coastguard service there and around the UK. I am reassured that the Under-Secretary of State for Transport, my hon. Friend the Member for Hemel Hempstead (Mike Penning), has said that the current modernisation proposals are not a done deal. Does the Prime Minister agree that it is very important to get the plans right?
The Prime Minister: I absolutely agree with my hon. Friend. She is a Cornish MP, and I am sure that she and the whole of the House would want me to say how much we feel for our colleague, my hon. Friend the Member for South East Cornwall (Sheryll Murray), who lost her husband in a tragic fishing accident. That demonstrates the extraordinary risks that people in coastal communities take, and our hearts should go out to her and her family.
We want to make changes only if they improve the coastguard support that people in fishing communities and elsewhere get. That is what the reform is about: trying to ensure that the real impetus is on the front line. If that is not the case, we will obviously have to reconsider the reforms, and that is why they are being reviewed. What I would say to everyone who cares about this issue is: work with us to make sure we get the maximum amount in those lifeboats and other ways of helping our fishing and other communities.
This would appear to indicate that the proposals to downgrade or close Stornoway CGS are dead in the water.

Saturday, 19 March 2011

Coastguard protest

At 2pm, a march was held from the centre of Stornoway to the Coastguard Station, just down the road from my position. It was well attended, about 200 people were on the march, with a police escort and the pipe band keeping up the spirits in the face of inclement conditions. Local politicians held short speeches once outside the CGS. The march was in protest against proposed cutbacks to the Coastguard service. The below video shows the march as it files past the Tesco supermarket on Shell Street.
httpv://www.youtube.com/watch?v=VjHccs0LF_g



March passing along Newton Street


Rally at the Coastguard Station

Wednesday, 24 February 2010

Faith and confidence

Over the past few weeks, a number of issues have crossed the public agenda which have failed to endear Comhairle nan Eilean Siar to its populace. In general terms, when people are elected to serve in public office, they sometimes have to take decisions that may not be popular. It is however the responsibility of a councillor, a member of parliament, a minister of government to take the bigger picture into account. Us simple citizens do not always have access to the bigger picture, and we should be able to trust our elected representatives to take the big decisions.

The issue of the Stornoway Town Hall refurbishment, which in itself I support, has thrown up a number of questionmarks over the way the consultation process was run. Opponents allege that CnES have been cutting corners - I am not in a position to ascertain whether that is true or not.

The issue of the windfarms, which I have opposed, underlines the point that I hope that councillors have made the right balance of judgement - something that I don't believe they have - in weighing up pros (monetary gain) and cons (environmental impact).

A round of proposed school closures was announced in recent times, slashing the number of schools in the Western Isles as whole by half. A consultation exercise is supposed to be in full swing. However, if private reports from North Uist are anything to go by, councillors cannot even be bothered to make it to a previously announced community meeting to discuss the closure of the school in Lochmaddy. I don't know if a vote of no confidence is sufficient to unseat a councillor, but this is absolutely atrocious.

The final point that blotted the CnES copybook from my perspective is the Stornoway Harbour Authority row. The Comhairle is moving to take over Stornoway Port Authority, because SPA was opposed to a plan to fill in part of the Inner Harbour for some very good reasons. I do not trust CnES to make the correct judgement in matters that the SPA currently hold sway over - they could do actual harm.

Thursday, 18 February 2010

Townscape

[caption id="" align="alignnone" width="500" caption="Stornoway Town Hall before the changes"]Stornoway Town Hall before the changes[/caption]

[caption id="" align="alignnone" width="500" caption="Stornoway Town Hall after the changes"]Stornoway Town Hall after the changes[/caption]

It was announced last night that the proposed changes to the Town Hall interior, with certain modifications, were recommended for approval by Comhairle nan Eilean Siar. This ratification is likely to happen tonight, Thursday 18th February. A campaign has been active on Facebook and on the island against these changes, with protesters vowing to take the fight all the way to the Scottish Government (who have the final say on alterations to a listed building) if not the European Courts.

I have previously stated that I am not opposed to the plans for changing the interior of the Town Hall, which are in fact unavoidable due to legislation pertaining to disabled access. However, everybody is entitled to their opinion.

What has stuck in my craw is the lack of opposition to two far more visible changes to the Stornoway townscape in recent years. The Maritime Building on Pier no 1 was pulled down in 2007, without anybody uttering a squeak. The old Shoeshop on Cromwell Street, the oldest house in Stornoway, was demolished in 2009. Again, without so much as a beep from anyone.

Comhairle nan Eilean Siar stands accused of mismanaging the consultation process regarding the Town Hall plans, and I am just wondering why nobody was voicing any opposition to the demolition of the two aforementioned buildings. No, they were not the bonniest in town, and the Maritime Building had been empty for a while. However, since the 1930s, people have left the island, many never to return, through the Maritime Building. Where were all the expat Lewismen and -women who are now writing whining letters to Hebrides News, from afar as northern England, imploring the Council not to vandalise the Town Hall? Why were they not sharpening their quills to oppose these very visible changes to the townscape of Stornoway?

Because, let's face it, the interior changes to the Town Hall are INVISIBLE from the outside. And there are far more people seeing the exterior of the Town Hall, pier number 1 and Cromwell Street, than there will be people seeing the inside of the Town Hall.

A pointless rant? No. I hope the Council take this opportunity to review their consultation procedures, to make planning applications like this more visible to the general public.

Tuesday, 9 February 2010

Town Hall refurbishments

A very strange development in the continuing saga of the proposed Town Hall refurbishments. Now the Council's own planning department have spoken out against the proposals, something that I find incredibly strange - and I use the word incredibly deliberately. I am not that familiar with planning procedures, but it would appear that one department within the Comhairle is not talking to another. If such a major project is put forward, you'd imagine that all departments would have talked it through with each other before it was submitted for scrutiny by the public.

Yes, I am in favour of the Town Hall refurbishment scheme. If only because it would have brought the building into line with legal requirements for disabled access, and taken it into more extensive use. I do not fault people for wishing to oppose as I believe they do so for genuine reasons.

But for the Comhairle's own planning department to voice its opposition so late in the day, and in wordings that are quite frankly redolent of the opponents' line of argument reduces the whole planning process to a farce and the Comhairle to the level of a banana republic.

Monday, 14 December 2009

Stornoway Town Hall - II

On Saturday (12th), about 100 people demonstrated outside Stornoway Town Hall against the proposed changes to the building's interior. Comhairle nan Eilean Siar, who I have freely criticised on other issues in the past, has finally spoken out to clarify what the refurbishments plans will and will not entail.

  • A removable stage, to be deployed when needed for performances

  • Sales of work and craft fairs can still be held, benefiting from (in fact) an increased floor space area

  • The community functionality will continue

  • Office space is already present in the building, the Council Service Point (off Point Street), which was very much in demand at the time of its opening


The overall aim is to increase usage of the building.

An on-line facility is to be provided to allow people virtual access and a walk through facility, to see what the proposals would actually look like.

More information on Hebrides News.

Tuesday, 8 December 2009

Town Hall plans

I've had a good look at the refurbishment plans for Stornoway Town Hall, and have taken note of the opposition to the plans. I can understand that people don't like change - it's not always for the best. However, I have to say that I find the opposition to the refurbishment plans, with all due respect, ill informed. As I understand it, the current stage will be replaced by an exhibition area. Access to the groundfloor of the Town Hall is to be given from the square to the west of the Town Hall (if anyone can remind me of the name of that square, which has a fountain in a rock in it, I'd be much obliged). Obviously, the entrance from Cromwell Street will be kept. The floorspace will be retained. Upstairs, the seating is to be removed, but the balustrade will be retained and turned into a functional area. Disabled access lifts are to be installed (high time). Upstairs, offices will actually be merged into more functional areas.

Personally, I am not opposed to the refurbishment plans. I understand and respect the wish of people to retain the stage in the Town Hall, which has been the focal point for many of the island's key historic moments. However, its current functionality is reduced from what it was 5 years ago. The An Lanntair cultural centre has taken over as the main venue for cultural events, and the Town Hall is being used on only a handful of occasions each year. I cannot remember whether a retractable stage is on the cards to take the place of the current fixed one (maybe wishful thinking).

I realise that, with 1200 people signed up to the Facebook group, opposing the refurbishment, including well-known names like Phil Cunningham, I'm going to be in the firing line. But I'm allowed my opinion, and have not shied away from controversy before.

Anyone wishing to register their opinion (for or against) can do so on the Council's website. There is no timelimit on objections.

Tuesday, 1 December 2009

Refurbishment plans for Stornoway Town Hall

This post is to raise awareness of a planning application for a refurbishment of Stornoway Town Hall. They can be accessed on the planning website of Comhairle nan Eilean Siar, and it is possible to leave feedback before 13 January 2010. Initial reactions on local blogs and websites is scathing, and a Facebook group has already been set up in protest.

Sunday, 29 November 2009

BBC Alba and Freeview

The BBC's Gaelic language channel, BBC Alba, has been on air for a year now. Unfortunately, it is only available on satellite and some cable providers. There has been a sustained campaign to get the channel on Freeview. The BBC Trust has responded with a consultation, in which everybody can participate.

I can't say that I am impressed with the BBC's offer to remove BBC radiostations from Freeview to make way for BBC Alba. Looking at Freeview, there are quite a number of stations on there that will not really be missed. I am not prepared to state my opinion on any individual broadcaster on an open Internet blog. Rather than that, I feel that the BBC should choose to remove one TV channel from Freeview, if only during the hours that BBC Alba transmits (17.30 to 23.30 each evening).

I leave it to each individual reader to participate (or not) and make their own views known.

Thursday, 29 October 2009

Faux pas

According to the Press and Journal newspaper, Scotland Office minister Ann Mckechin went flying on the proverbial banana-skin on Tuesday. She spoke in Parliament in Westminster, criticising the rejection by the Scottish Government of the Lewis Windpower Plan for North Lewis. You'll remember, 180 turbines, each 450 feet tall, stretching the 45 miles from Port of Ness via Bragar to Stornoway. The planning application was turned down as the windfarm violated an area, subject to a European Habitat Directive, which, would have subjected the UK government to very large fines indeed. The Scottish Government was therefore correct in rejecting the application.

It is a pity that our MP did not quote these reasons when replying to the Minister, instead saying that you can't foist something on people if they don't want it.

Ms Mckechin stated that the windfarm would have made a large contribution towards the renewable energy targets, set by the UK government. I am fed up to the back teeth with "targets". The same argument has been bandied about in relation to the Beauly to Denny powerline upgrade, and it appears to be a justification for not following proper procedures in the planning process. The RSPB suspects this also to be the case with regards to the Pentland Road scheme.

I want to make it clear that I am not opposed to windfarms perse - I just prefer to see them offshore rather than onshore.

Wednesday, 28 October 2009

Windfarms and pylons - II

An update on the two stories I mentioned in my previous two posts.

The approval for the Pentland Road windfarm, 6 turbines near the Achmore junction, has elicited expressions of deep concern from the RSPB. They suggest that the siting of the turbines will adversely affect the golden eagles that live in the area. An environmental impact study, which accompanied the planning application, was described as shoddy, as not conducted in accordance with standards laid down for that type of investigation. The RSPB will now closely scrutinise proceedings and decide on a course of action. As I said last week, a poor exercise in accountability and now, it would appear, an even poorer exercise in planning.

The Beauly to Denny upgrade story from Monday appears to have been a leak, and has blown up into a bit of a storm. One person has alleged that approval for the upgrade was already decided on before the public inquiry was held. I am not at all surprised, bearing in mind the UK government's policies on renewable energy targets. What surprised me was the assertion that all of Scotland's energy needs could be met from renewables, without recourse to nuclear (which I don't much like either) or other technologies, such as clean coal.

What these two items have in common is an arrogant administration, whether it be Comhairle nan Eilean Siar, or the Scottish Government, thinking they are so powerful that they can ride rough-shod over the due planning process, and just making the right noises at the right time, without taking any account whatsoever of public opinion, scientific evidence or legislation.

Monday, 26 October 2009

Windfarms and pylons

[caption id="" align="alignleft" width="203" caption="Beauly to Denny powerline (image courtesy BBC)"]Beauly to Denny powerline (image courtesy BBC)[/caption]

The BBC is reporting that the planned upgrade to the power-line between Beauly (near Inverness) and Denny (near Stirling) is recommended for approval by MSPs. The current line carries 132 kV, which will be increased to 400 kV. The pylons are expected to be 200 feet / 60 metres tall each, and there will be 600 of them along the length of the current powerline. The planning application for this upgrade has been the subject of a public inquiry, the report of which was submitted to Scottish Ministers 8 months ago. The application attracted 18,000 objections.

The upgraded powerline is important for renewable energy projects across the Highlands and Islands, as it will convey electricity, generated by these projects, to users in the Scottish Central Belt and into the UK National Grid.

Objectors have stated that this will irrevocably harm the iconic landscape of the Scottish Highlands, and adversely affect tourism. They also think that alternative options have not been sufficiently explored.

This issue is controversial, and involves high stakes, politically and economically. The Beauly to Denny powerline is part of a policy to cover Scotland's [sic] energy needs, without recourse to new nuclear powerstations.

The relevance to Lewis is high. As previously reported on this blog, a number of renewable energy projects are in the pipeline for this island, including a 39-turbine windfarm at Eishken, and a smaller 6-turbine project some 5 miles outside Stornoway. Similar schemes have been mooted for North Tolsta, Ballantrushal and the West Side between Shawbost and Dalbeg. Other schemes include a tidal barrage at Shader (although is probably only going to generate electricity for local consumption) and a wave-energy project off Great Bernera. In order to get this power to mainland consumers, a powerline will also have to be constructed between Little Loch Broom (Dundonnell) and Beauly, as well as a subsea cable (referred to as an interconnector).

Should final approval be granted by Scottish ministers (very likely), then we are likely to see the construction of the Eishken Windfarm go ahead at pretty short notice, and the same will apply to the Pentland Road scheme.

This blog has consistently voiced an opinion opposed to large scale windfarms, and in disagreement with the arguments mooted in favour. I do not believe that windfarms will bring long-term, sustained employment to the Isle of Lewis. There will be short-term work in the construction of the windturbines and electricity infrastructure. Once the turbines are in place, only a handful of people will be needed to monitor and operate the windfarm. The community benefits of the Eishken windfarm are spurious, in my opinion, as they require a massive cash injection from said community - and Lochs is not exactly the most affluent area in this part of the world.

The environmental impact will also be substantial, and I would like to take this opportunity to oppose the opinion, voiced in comments on the previous post, that windfarms do not harm eagles. They do. In California, dozens of the raptors are being killed by a massive windfarm in the desert there. I am also restating my assertion that although nobody is entitled to a view, views is what attracts tourism. That being a mainstay of the island makes a shore-based windfarm a good example of a shot in the foot.

Although the final decision rests with Scottish Ministers, I cannot imagine that approval for the powerline upgrade through the Highlands will be taken lying down by its opponents.

Sunday, 21 June 2009

Core Paths

Comhairle nan Eilean Siar have launched a consultation on core paths in the Western Isles. This is a spin-off from the Land Reform Act of 2003, which requires local authorities to establish a network of paths to give the public reasonable access to their area. A paper copy can be viewed in public libraries in Stornoway, Tarbert, Balivanich and Castlebay. The text is also contained in a number of PDF-files on the Comhairle's website. The consultation closes on Friday 7 August 2009. Feedback can be given in written and email form by that date.

Thursday, 11 June 2009

Consultation on large scale windfarms in the Western Isles

Comhairle nan Eilean Siar has published draft supplementary guidance for large scale windfarms in the council area. It can be downloaded in English and Gaelic from this page. Its purpose is:

To set out policies and other advice to assist in positively planning for the provision of large scale wind energy developments (over 20 Mega Watt) in the Outer Hebrides.

All concerned are encouraged to read and give feedback on said draft guidance, using the contact information on the same webpage by Tuesday 4 August 2009.

With thanks to commenter Lady GarGar for drawing this to my attention

Friday, 24 August 2007

Environmental vandalism

Yesterday, the news in the north of Scotland was dominated by protests against five windfarms on the Dava Moor, south of Inverness. This is an area of pristine wilderness, on which five lots of windturbines, each standing 500 feet tall, will be built. A Member of the European Parliament has branded these proposals environmental vandalism, and has promised to pull out all the stops to stop these schemes in their tracks.

Heard this before?

Lewis is threatened with three windfarms, with nearly 300 turbines, each standing 500 feet tall in areas of pristine wilderness, in the shape of the Barvas Moor, Eishken and Pairc. Methinks that's also environmental vandalism, industrialisation at an unmentionable scale and flagrant flouting of public opinion.